06About

An engineering team that writes metrics into delivery

We do not trade general-purpose equipment, and we do not promise results that cannot be verified. We integrate lines by laying out conditions, solutions, takt and boundaries clearly.

Engineers discussing production line drawings on the shop floor

Custom projects have no standard answer, but they do have shared grounds for judgement: whether takt can be met, under what conditions yield is counted, how stations are divided, and whether boundaries are written down. We use these as the common language of a project.

A project starts with a site survey, and acceptance criteria are fixed at the solution stage. Manufacturing and debugging complete FAT in our own workshop, followed by SAT and ramp-up at the customer site. The process looks slower, but there is less rework.

What we do not do

  • We do not take projects whose takt target cannot be verified; we assess first and then decide whether to bid.
  • We do not assemble purchased equipment and call it line integration.
  • We do not blur delivery boundaries in the contract and recover margin through later changes.
  • We do not promise yield figures detached from operating conditions.

Information to be added

Founded in
To be added
Customers served
To be added
Certifications
To be added

Until public and verifiable information is available, we leave figures blank rather than mislead.

07Team structure

Four roles, one team on the same line

Mechanical, electrical, software and commissioning engineers work within one project, so design and site do not blame each other.

01

Mechanical

Mechanism and fixture design covering reach, rigidity and changeover structure.

02

Electrical

Schematics, cabinet layout and safety circuits covering interfaces and compliance.

03

Software

PLC, robot and host programs covering takt scheduling and data return.

04

Commissioning

In-house integration and on-site ramp-up, driving metrics to the acceptance basis.

08Working method

Four principles from quotation to acceptance

01

Scope first

Confirm fixed constraints before discussing solution and price

02

Takt first

Calculate process time before mechanism design follows it

03

Maintainable

Readable, traceable programs and drawings for customer maintenance

04

Acceptance upfront

Acceptance criteria written into the proposal, avoiding post-delivery disputes

Talk to us about your line

You do not need a complete plan first; describing the conditions and target is enough.

Submit Project RFQ