New Energy Cell Module Assembly Line on site
Back to case list
New Energy2025 (Sample)Sample metrics

New Energy Cell Module Assembly Line

Stacking, laser welding and EOL testing in one line; takt and yield are accepted together

Takt
12 s/pc
Yield
99.2%
Stations
9
Delivered
2025 (Sample)

Background and problem

The original line moved parts manually between stacking and welding, so takt varied by shift. There was no in-line inspection after welding, and defects surfaced only at the end of the line, driving high rework cost.

Solution structure

The line was rebuilt around nine stations: loading and barcode, stacking, pre-positioning, laser welding, post-weld inspection, leak test, EOL test, NG sorting and buffering. Robots and vision handle positioning; the PLC manages the takt clock and interlocks, and process data for each part is returned to MES.

Station zoning and flow diagram01020304050607Illustration: station split and flow, not an actual layout
New Energy Cell Module Assembly Line solution detail 1
New Energy Cell Module Assembly Line solution detail 2

Metrics and acceptance basis

Takt
12 s/pc (Sample; based on a single 8-hour shift)
Yield
99.2% (Sample; counted at end-of-line full inspection)
Stations
9 stations (including load/unload and buffer stations)

The values above are sample figures used to explain the measurement approach. Actual projects follow the acceptance conditions agreed in the contract.

Delivery boundaries

Included

solution design, mechanical and electrical design, equipment manufacturing, in-house debugging and FAT, on-site installation, commissioning and operator training.

Not included

building modification, overhaul of the customer's upstream equipment, and long-term supply of consumables and fixtures.