Five stages you can check at every step
Most project problems come from boundaries and acceptance criteria. Each stage below lists inputs, deliverables, customer support and acceptance points.
Requirement and condition review
Find the real constraints before discussing a solution. Many project problems surface here: the takt target does not match process time.
- Inputs
- Product drawings, process description, target takt or output per shift, floor dimensions, existing equipment list
- Deliverables
- Site survey notes, confirmed requirement sheet, preliminary feasibility view
- Customer support
- Arrange a site visit and provide samples and existing data
- Acceptance point
- Both sides confirm scope boundaries and fixed constraints
Solution and takt simulation
Calculate takt before drawing mechanisms. Station split, robot selection and buffering all serve the takt target.
- Inputs
- Confirmed requirement sheet, process time data, incoming variation range
- Deliverables
- Process route, station split, takt table, layout draft and preliminary quotation
- Customer support
- Confirm process feasibility and acceptance criteria
- Acceptance point
- Solution review passed; takt and station count locked
Design and manufacturing
Mechanical, electrical and software work run in parallel, with long-lead purchased parts locked first.
- Inputs
- Approved solution, purchased-part selection list
- Deliverables
- 3D design, electrical schematics, PLC and robot programs, equipment build
- Customer support
- Confirm interface conditions (utilities, network, floor load)
- Acceptance point
- Design review passed; equipment complete
In-house debugging and FAT
The full line runs in our own workshop under agreed conditions and ships only after the customer verifies it.
- Inputs
- Assembled equipment, customer samples and fixtures
- Deliverables
- Integration records, FAT report, issue list and closeout records
- Customer support
- Provide samples and send staff to attend FAT
- Acceptance point
- FAT passed: takt, yield and safety items meet target
On-site installation and ramp-up
Commissioning is not the end of delivery; issues are closed on the line during ramp-up, alongside role-based training.
- Inputs
- Shipped equipment, confirmed site conditions, training plan
- Deliverables
- Installation records, SAT report, operation and maintenance manuals, training records
- Customer support
- Provide an installation window, power and logistics support, and assign operators
- Acceptance point
- SAT passed and ramp-up starts; issues closed against the list
FAT · Factory acceptance
The line runs continuously under agreed conditions in our workshop to verify takt, yield and safety. Issues are recorded and closed before shipment, so they are not carried to the customer site.
SAT · Site acceptance
After on-site commissioning, the line is verified against actual incoming material and shift conditions. SAT passing starts the ramp-up period, with training and manuals delivered together.