04Delivery Process

Five stages you can check at every step

Most project problems come from boundaries and acceptance criteria. Each stage below lists inputs, deliverables, customer support and acceptance points.

01

Requirement and condition review

Find the real constraints before discussing a solution. Many project problems surface here: the takt target does not match process time.

Inputs
Product drawings, process description, target takt or output per shift, floor dimensions, existing equipment list
Deliverables
Site survey notes, confirmed requirement sheet, preliminary feasibility view
Customer support
Arrange a site visit and provide samples and existing data
Acceptance point
Both sides confirm scope boundaries and fixed constraints
02

Solution and takt simulation

Calculate takt before drawing mechanisms. Station split, robot selection and buffering all serve the takt target.

Inputs
Confirmed requirement sheet, process time data, incoming variation range
Deliverables
Process route, station split, takt table, layout draft and preliminary quotation
Customer support
Confirm process feasibility and acceptance criteria
Acceptance point
Solution review passed; takt and station count locked
03

Design and manufacturing

Mechanical, electrical and software work run in parallel, with long-lead purchased parts locked first.

Inputs
Approved solution, purchased-part selection list
Deliverables
3D design, electrical schematics, PLC and robot programs, equipment build
Customer support
Confirm interface conditions (utilities, network, floor load)
Acceptance point
Design review passed; equipment complete
04

In-house debugging and FAT

The full line runs in our own workshop under agreed conditions and ships only after the customer verifies it.

Inputs
Assembled equipment, customer samples and fixtures
Deliverables
Integration records, FAT report, issue list and closeout records
Customer support
Provide samples and send staff to attend FAT
Acceptance point
FAT passed: takt, yield and safety items meet target
05

On-site installation and ramp-up

Commissioning is not the end of delivery; issues are closed on the line during ramp-up, alongside role-based training.

Inputs
Shipped equipment, confirmed site conditions, training plan
Deliverables
Installation records, SAT report, operation and maintenance manuals, training records
Customer support
Provide an installation window, power and logistics support, and assign operators
Acceptance point
SAT passed and ramp-up starts; issues closed against the list

FAT · Factory acceptance

The line runs continuously under agreed conditions in our workshop to verify takt, yield and safety. Issues are recorded and closed before shipment, so they are not carried to the customer site.

SAT · Site acceptance

After on-site commissioning, the line is verified against actual incoming material and shift conditions. SAT passing starts the ramp-up period, with training and manuals delivered together.