05Service

After handover, the line keeps running

One hour of downtime often costs more than the integration fee you saved. Response, spares and training are written into delivery, not discussed after a failure.

Technician maintaining a robot workstation on the shop floor

Service basis

Response times and periods in this page are samples that explain the service mechanism. Actual response levels, spare parts scope and ramp-up duration follow the project contract.

Response and remote diagnosis

2-hour response (Sample)

First response within business hours; night and holiday reports follow the contract.

  • Connect remotely first to read programs and logs; no site visit when the issue can be solved remotely.
  • If a site visit is needed, schedule by fault level and provide a temporary recovery suggestion.
  • Every case is recorded, and recurring issues are written back into programs and manuals.

Critical spares on hand

Shipped within 24 hours (Sample)

The stocked parts list is agreed at acceptance; non-stocked parts follow supplier lead time.

  • Wear parts, key electrical components and fixture consumables are pre-stocked against the line bill of materials.
  • Spares are linked to equipment records, so model and version are confirmed quickly at a service call.
  • We help customers define a minimum stock list, avoiding downtime for the sake of inventory savings.

Training and ramp-up

2-week ramp-up (Sample)

Ramp-up duration follows line complexity and shift arrangement and can be adjusted in the contract.

  • Role-based training for operation, changeover and daily maintenance, handed over after assessment.
  • Issues are closed on the line during ramp-up, producing workable work instructions.
  • Troubleshooting paths for common faults are provided to avoid unnecessary stops.

Retrofit and capacity expansion

Assessed per condition

Takt upgrades, added stations and changeover retrofits on existing lines are assessed before quotation.

  • Confirm whether existing control programs and mechanical interfaces support expansion before scoping.
  • Implement in stages to limit impact on continuous production.
  • Re-verify takt and yield basis after retrofit, rather than changing equipment without changing acceptance.
06FAQ

Three questions we hear most about service

Can you build a single station instead of a full line?

Yes. Single-station integration follows the same process as a full line; only the boundary and interface scope differ.

Must spare parts be purchased from you?

No. We provide the list and models and customers may source directly; we stock critical parts to shorten dispatch time.

How long will a retrofit stop the line?

It depends on scope. Work is usually staged to keep the stop window acceptable, and the window is stated in the proposal.

Need a service and spare parts list template?

After you submit your conditions, we attach a recommended spare parts list and response levels to the proposal.

Contact Us